Sign In | Join Free | My himfr.com |
|
Ask Lasest Price | |
Brand Name : | Hengcheng |
Model Number : | HVM2500 HVM2800 HVM3400 HVM3700 HVM4200 HVM4500 HVM4800 HVM5100 HVM5600 |
Certification : | ISO Patent Certificate High-Tech Product Certificate |
Price : | Negotiable |
Payment Terms : | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
Supply Ability : | 5 sets/month |
Delivery Time : | 60 days |
Large Capacity Slag Grinding Mill Vertical Grinding Mill / Vertical Roller Mills
Description
For grinding slag, vertical mills are used for high output. Hefei Hengcheng has pioneered research and development of a set of drying, grinding and grading based on the development trend of the industry, aiming at the bottleneck of traditional mills with low output, high energy consumption and high maintenance costs. The HVM vertical pulverizer, which integrates , conveying, has set off a frenzy of imitation in the field of large-scale pulverizing, and has become the mainstream equipment in the pulverizing field of coal, cement, slag, and non-metallic ores.
What is the slag used for?
1. Put the water slag and activator (cement, lime and gypsum) on
the wheel mill and grind it with water to make mortar, and then mix
it with the coarse aggregate to form wet-milled slag concrete.
2. As a raw material to produce slag Portland cement, granulated
blast furnace slag is mixed with Portland cement clinker, and then
3~5% gypsum is added to mix and grind to make slag Portland cement,
which can be better used in water engineering , harbour and
underground works, etc.
3. It can be used to produce slag bricks and wet-rolled slag
concrete products.
4. Application of expanded slag and expanded beads Expanded slag is
mainly used as lightweight aggregate to make lightweight concrete.
5. It can be prepared with slag and gravel concrete, which has a
wide range of applications in road engineering and railway
engineering.
【Working Principle】
The motor drives the grinding disc to rotate through the reducer,
the material falls into the center of the grinding disc from the
feed inlet, and the hot air enters the mill from the air inlet.
Under the action of centrifugal force, the material moves to the
edge of the grinding disc, and is crushed by the grinding roller
when passing through the annular groove on the grinding disc. The
crushed material is carried by the high-speed airflow at the air
ring at the edge of the grinding disc, and the large particles fall
directly on the grinding disc. Re-grinding, when the material in
the airflow passes through the dynamic and static separator, under
the action of the rotating rotor, the coarse powder falls on the
grinding disc for re-grinding, and the qualified fine powder is
ground together with the airflow and collected in the powder
collecting device, which is product. Moisture-containing materials
are dried during contact with hot gas to achieve the required
product moisture.
Technical Data
Model | HVM2500 | HVM2800 | HVM3400 | HVM3700 | HVM4200 | HVM4500 | HVM4800 | HVM5100 | HVM5600 |
Grinding Table Median Diameter(mm) | 2500 | 2800 | 3400 | 3700 | 4200 | 4500 | 4800 | 5100 | 5600 |
Capacity(t/h) | 23-26 | 50-60 | 70-83 | 90-110 | 110-140 | 130-150 | 150-180 | 180-200 | 200-220 |
Raw Material Moisture | <15% | ||||||||
Product Specific Surface Area | ≥420㎡/kg | ||||||||
Product Moistrue | ≤1% | ||||||||
Main Motor Power(kW) | 900 | 1800 | 2500 | 3350 | 3800 | 4500 | 5300 | 6150 | 6450/6700 |
Illustrate | Re:Mining slag bond index≤25kWh/t,Steel slag bond index≤30kWh/t,The output will decrease by 30%-40% when grinding steel slag micro power |
The slag milling process is as follows:
The first stage: drying of raw materials
According to the moisture content of the raw materials and the
moisture content requirements of the finished product, the slag
uses a dryer to remove moisture for materials with high moisture
content. Materials with low moisture content can be treated with
hot air through a hot blast stove to the mill. Through the process
of grinding and drying, the equipment investment cost and operating
energy consumption cost of the dryer can be reduced.
Stage 2: Grinding
The dried slag small pieces of material are sent to the raw
material hopper by the elevator, and then sent to the grinding
chamber of the mill evenly and quantitatively by the conveying
feeder for grinding.
Stage 3: Grading
The pulverized materials are classified by the classification
system, and the unqualified powders are classified by the
classifier and then returned to the main engine for re-grinding.
Stage 4: Collection of Finished Products
The powder that meets the fineness enters the dust collector
through the pipeline with the airflow for separation and
collection, and the collected finished powder is sent to the
finished product silo by the conveying device through the discharge
port, and then loaded into the powder tanker uniformly.
![]() |