Sign In | Join Free | My himfr.com
Home > Pneumatic Conveying Pump >

300t/H Dense Phase Pneumatic Powder Conveying System Pump For Cement Hopper

Hefei Hengcheng Industrial Equipment Technology Co., Ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now
    Buy cheap 300t/H Dense Phase Pneumatic Powder Conveying System Pump For Cement Hopper from wholesalers
     
    Buy cheap 300t/H Dense Phase Pneumatic Powder Conveying System Pump For Cement Hopper from wholesalers
    • Buy cheap 300t/H Dense Phase Pneumatic Powder Conveying System Pump For Cement Hopper from wholesalers

    300t/H Dense Phase Pneumatic Powder Conveying System Pump For Cement Hopper

    Ask Lasest Price
    Brand Name : Hengcheng
    Model Number : PCD24/H PCD26/H PCD28/H PCD30/H
    Certification : CE ISO
    Price : Negotiable
    Payment Terms : L/C, D/A, D/P, T/T, Western Union, MoneyGram
    Supply Ability : 5 sets\month
    Delivery Time : 60 days
    • Product Details
    • Company Profile

    300t/H Dense Phase Pneumatic Powder Conveying System Pump For Cement Hopper

    300 t / h Dense Phase Pneumatic Conveying System Conveying Pump For Cement Hopper

    Description

    Positive pressure dense phase pneumatic conveying refers to the transportation process with a solid content of 1030kg/m3 or a solid-gas ratio greater than 25. The working gas flow rate is low and high-pressure transportation is required.


    【Scope of application】


    Positive pressure dense phase pneumatic conveying, positive pressure dilute phase pneumatic conveying, positive pressure dense phase pneumatic conveying


    【Material】


    Powder material, granular material


    Large Capacity Pneumatic Conveying Bin Pump Parameter Table

    Conveying MaterialBulk Density (t/m3)ModelPCD24/HPCD26/HPCD28/HPCD30/HConveying Distance
    Specification16~20m318~22m320~27m326~32m3Level (m)Level (m)
    Pulverized Coal0.5Delivery Volume (t/h)50~8060~9065~11080~13020020
    Fly Ash0.7575~12585~13095~160125~19020020
    Limestone Powder/Mineral Powder0.880~13090~140100~170130~20020020
    Cement/Raw Meal1100~150115~175130~215165~26020020


    Long-distance Pneumatic Conveying Bin Pump Parameter Table

    Conveying MaterialBulk Density (t/m3)ModelPCD24/LPCD26/LPCD28/LPCD30/LConveying Distance
    Specification16~20m318~22m320~27m326~32m3Level (m)Level (m)
    Pulverized Coal0.5Delivery Volume (t/h)20~4025~4530~5545~65100025
    Fly Ash0.7535~6045~6545~8065~95100025
    Limestone Powder/Mineral Powder0.840~6545~7050~8570~100100025
    Cement/Raw Meal150~8055~9065~11090~120100025

    Conventional Grid Pneumatic Conveying Bin Pump Parameter Table

    Conveying MaterialBulk Density(t/m3)ModelPCD18/NPCD20/NPCD20/NReference Conveying Distance
    Specification5.0~6.7m37.0~10.0m310.0~15.0m3Level (m)Vertical (m)
    Pulverized Coal0.5Delivery Volume (t/h)12~2016~3225~5050030
    Fly Ash0.7518~3225~4835~7050
    Limestone Powder/Mineral Powder0.820~3526~5138~7550030
    Cement/Raw Meal1.024~4232~6548~9550030
    Silicon Powder1.228~5040~7555~11550030

    Parameter Table Of Small Size Pneumatic Conveying Bunker Pump

    MaterialBulk Density(t/m3)ModelPCD08/MPCD10/MPCD12/MPCD14/MReference Conveying Distance
    Specification0.2~0.5m30.6~1.6m31.5~2.5m32.5~5.0m3Level (m)Vertical (m)
    Pulverized Coal0.5Delivery Volume (t/h)0.5~1.81.5~5.55.0~9.08.0~18.010020
    Fly Ash0.750.9~2.82.5~8.57.0~14.012.0~27.010020
    Limestone Powder/Mineral Powder0.81.0~3.03.0~9.08.0~15.012.0~28.010020
    Cement/Raw Meal1.01.2~3.53.5~11.510.0~18.016.0~36.010020
    Silicon Powder1.21.5~4.04.5~13.512.0~20.019.0~43.010020


    【Characteristic】


    Realize clean and pollution-free transportation
    It can prevent the material from being damp, stained or mixed with other sundries, and can ensure the quality of the conveyed material.


    Realize a variety of process operations
    In the process of conveying, the processes of measuring, batching, screening, mixing, iron removal and impurity removal can be realized at the same time to meet your production needs.


    Improve workshop sanitation conditions
    Adopt automatic feeding, high-precision dust removal device and sealed pipeline conveying method, so that there is no dust in feeding, no leakage in conveying, and ensure the cleanliness of the workshop.


    Improve efficiency and plant configuration
    Realize bulk material transportation, high efficiency, flexible arrangement of pipelines, and reasonable process configuration of factory equipment.


    R & D concept is recognized
    The company insists on taking technological innovation as the driving force, constantly innovating around the market and customer needs, focusing on absorption and improvement, supplemented by innovation, and achieving continuous technological breakthroughs.


    Production efficiency increased by 20%
    High degree of automation, time saving, labor saving, high production efficiency


    20% reduction in labor costs
    Each production line only needs 1-2 people on duty, reducing labor and labor costs


    Environmental health
    Adopt automatic feeding, high-precision dust removal device and sealed pipeline conveying method to ensure no dust in feeding and ensure the cleanliness of the workshop


    No plugging, easy maintenance
    Stable operation, no plugging, simple structure, easy maintenance


    High precision metering
    The metering and batching accuracy is as high as 2‰, which improves the quality of products and reduces the ratio of defective products.


    Simple and convenient operation
    High degree of automation, simple and convenient operation


    Quality 300t/H Dense Phase Pneumatic Powder Conveying System Pump For Cement Hopper for sale
    Inquiry Cart 0
    Send your message to this supplier
     
    *From:
    *To: Hefei Hengcheng Industrial Equipment Technology Co., Ltd
    *Subject:
    *Message:
    Characters Remaining: (0/3000)